How long does it take to build an app? A simple app usually takes about 2 to 4 months, a mid-complexity app 4 to 8 months, and a complex platform 9 months or more. The real timeline depends on what the app does, how many screens and integrations it has, and how quickly you approve each stage.
If a vendor promises a full app in two weeks, be skeptical. If a vendor can't give you even a range, be skeptical too. This guide explains where those numbers come from, what drives each stage, and how to shorten the path without cutting quality.
How long does it take to build an app, realistically?
There is no single number, but there is an order of magnitude. Guides from development studios, such as Riseup Labs, commonly use ranges like these:
- Simple app: 2 to 4 months. A few screens, login, one main flow, no tricky integrations.
- Mid-complexity app: 4 to 8 months. Payments, an admin dashboard, notifications, connections to other systems.
- Complex app: 9 to 18 months or more. Many user roles, real-time features, large data volumes, heavy business rules.
Keep in mind these are market estimates, and most sources are companies that sell development. Numbers vary between them (some quote just weeks for very lean apps). Use them as a starting point for a conversation, not as a promise. Your real timeline comes from a well-defined scope.
The stages of an app project and how long each takes
The total timeline is the sum of stages. Knowing each one shows you where time can be saved and where shortcuts get expensive.
1. Discovery and planning
This is where you define what the app does, for whom, and what stays out of version one. It typically takes 1 to 4 weeks. Skipping it is the most common mistake: the project starts fast and slows down later in rework.
2. UI/UX design
Navigation flows, prototypes and the visual look are created here. It takes from a few weeks to around two months, depending on screen count and how many revision rounds you request. For a clearer picture of the two disciplines, see our guide on the difference between UI and UX.
3. Development
This is the longest stage. It covers the app itself (what users see) and the server behind it (where data, accounts and rules live). For simple and mid-size apps it often takes 6 to 12 weeks or considerably more, depending on scope.
4. Testing and fixes
Testing on multiple devices, fixing bugs and validating with real users takes 3 to 6 weeks in many projects. Cutting tests to save time usually comes back as bad app store reviews.
5. Store submission
Publishing to the App Store and Google Play requires developer accounts, listing text, images and store review. Reserve one to two weeks, and remember a rejection over a policy detail can add days.
What makes an app timeline grow
Two similar-looking apps can have very different timelines. The biggest drivers are:
- Number of features. Each new function (chat, booking, payments, reports) adds weeks.
- Third-party integrations. Payment gateways, ERPs, CRMs and other companies' APIs bring surprises you don't control.
- Platforms. iOS and Android together take more work than one. Cross-platform technology reduces the effort, but it has trade-offs.
- Team experience. A team that has built similar projects makes fewer mistakes and estimates better.
- Approval delays. The most underestimated factor. If each delivery waits two weeks for feedback, the schedule doubles without anyone doing anything wrong.
- Scope changes midway. Asking for "just one more screen" every week is the surest way to slip.
How to shorten the timeline without losing quality
You can ship faster, as long as the choices are smart:
- Start with an MVP. An MVP is the minimum version of the app, with only what solves the core problem. You launch sooner, learn from real usage and improve later. The same approach works for software products, as we explain in how to build a SaaS from scratch.
- Write the scope down. A clear list of what's in and what waits for version 2 prevents arguments and delays.
- Decide fast. Name one person responsible for approving deliveries within a few days.
- Have content ready. Logo, copy, images and store accounts ready before kickoff save weeks of waiting.
- Use cross-platform tech when it fits. One codebase for iOS and Android saves time in many cases.
- Ask whether a website already solves it. If the goal is just to present your business, you may not need an app. See our guide on how long it takes to build a website.
A checklist to validate a timeline with a vendor
Before signing, ask:
- Is the timeline split into stages with partial delivery dates?
- What is inside the scope, and what costs extra?
- How much feedback time does the team expect from you in each phase?
- Will there be testable versions during the project, or only at the end?
- Who handles store submission and any rejections?
- What happens if the deadline slips because of scope changes?
Red flags: a very short deadline with no explanation, no planning stage, no chance to see the app working before the end, and no contract with a defined scope.
Frequently asked questions
Can you build an app in one month?
Only in very specific cases: a very lean MVP with few screens, no integrations and a scope locked from day one. For most businesses, a month is too short to plan, design, build, test and publish with quality. A more realistic expectation for a simple first version is two to four months.
Which stage takes the longest when building an app?
Usually development, where the app and its server are built and where every feature and integration adds time. In practice, though, what delays projects most is waiting for approvals and changing scope. Planning well and responding quickly shortens the total timeline a lot.
Does building for both iPhone and Android take twice as long?
Not necessarily. With cross-platform technology, much of the code is shared, so the timeline grows by less than double. Still, testing on each system and following each store's rules adds some time. Ask your vendor which approach fits your project.
How long does app store approval take?
It depends on the store and the moment, but it's common to reserve a few days to two weeks for review. Rejections over policy, privacy or content details can stretch that. A good practice is to prepare the submission in parallel with the end of development, not after.
Why do simple and complex apps have such different timelines?
The difference comes from features, integrations, user roles and data volume. A catalog app with login is very different from a platform with payments, chat and an admin panel. That's why serious estimates only come after a conversation about scope.